DSV BESS 1.0
DSV

2025
8 MW / 8 MWh
An 8 MW / 8 MWh BESS was added to DSV's solar plant in Horsens, actively selling system services to the grid in combination with the PV, coordinated through the park controller delivered by Migra Teknik. The BESS will be further expanded by an additional 9 MW / 18 MWh, bringing the total to 17 MW / 26 MWh, as part of BESS 2.0