Salling Group Solpark
Solar Future

2026
10.2 MWp
Plant Capacity: 9.3 MW / 9.79 MVA in POC
Panel type: | JAM72D42-640 BiFacial N-Type Dobble glass. |
Amount of paneles: | 17,460 pcs. |
Inverter: | 32 pcs. 330 kW Huawei inverters |
Mounting system: | Field |
Plant area: | 50,000 m2 |
Orientation | East/West |
Pitch: | 15° |
Total power: | 11.174 MWp |
Simulated production: | 10 GWh/year |
Migra Teknik resposibilities includes delivery, installation, and commissioning of the complete monitoring and control infrastructure for the solar park, enabling full remote monitoring, regulation, and grid compliance for the plant. Our scope covers everything from cabinet-level hardware integration to final grid-operator approval testing.
Key Deliverables
Control System Integration — Installation, startup, and configuration of the Power Plant Controller (PPC) and supporting hardware in the technical building, enabling real-time monitoring and regulation of the entire park
Network & Connectivity — Setup of VPN/router infrastructure with fixed public IP, plus coordination with the grid operator's router/RTU integration.
Fiber & Communications — Fiber connections into SACU boxes, supporting MBUS powerline communication between inverters and control units.
Pre commissioning — Setup across SACU boxes, Huawei JUPITER-3000K-H1 units, and Huawei SUN2000-330KTL-H1 inverters.
Monitoring Equipment — Installation of irradiance sensor modules and insulation monitoring devices across the site.
Monitoring Portal Setup — Configuration of the plant in Huawei's FusionSolar monitoring platform.
Grid Compliance Testing — Coordination and execution of signal (cold) and function (hot) tests with the grid operator; RfG documentation and FON test regulation.
Approvals — Cross-party collaboration to secure EON, ION, and FON grid connection approvals.
Transformer Commissioning — Participation in Huawei STS transformer commissioning.
Scope Highlights
✓ End-to-end SCADA hardware integration
✓ Multi-vendor coordination (grid operator, engineering consultants, switching authority)
✓ Inverter commissioning
✓ Full grid-compliance test
✓ Remote monitoring platform deployment