Sommerdal

Solar Future

2026

6.2 MWp

20 MWh

10.8 MW

The plant will consist oh both PV and BESS with an existing wind park of three 3.6 MW turbines that will be regulated after in the POC. Migra Teknik resposibilities includes delivery, installation, and commissioning of the complete control infrastructure for the solar park and BESS, enabling regulation and grid compliance for the plant. Our scope covers everything from cabinet-level hardware integration to final grid-operator approval testing.


Panel rating:

720 Wp

Amount of paneles:

8,604 pcs.

Inverter:

20 pcs. 330 kW Huawei inverters

/ 48 pcs. 213 kW Huawei inverters

Sub transformer station (STS)

3 pcs. 6600 kVA Huawei STS

Wind

3 pcs. 3.6 MW turbines

Mounting system:

Field

Plant area:

26.187 m2

Orientation

South

Total PV power:

11.174 MWp

Total BESS power

10.3 MVA

Power in POC

10.8 MVA


Key Deliverables

  • Control System Integration — Installation, startup, and configuration of the Power Plant Controller (PPC) and supporting hardware in the technical building.

  • Network & Connectivity — Setup of VPN/router infrastructure with fixed public IP, plus coordination with the grid operator's router/RTU integration.

  • Grid Compliance Testing — Coordination and execution of signal (cold) and function (hot) tests with the grid operator; RfG documentation and FON test regulation.

  • Approvals — Cross-party collaboration to secure EON, ION, and FON grid connection approvals.


More projects with

Solar Future

Ongoing

Solar Future

Salling Group Solpark

2026

10.2 MWp

Solar Future

DSV PV

2025

34.5 MWp

DSV Rooftop PV
Solar Future

Øresundsbroen E1 E2

2021

245 kWp

Øresundsbroen E1 E2

Ongoing

Solar Future

Salling Group Solpark

2026

10.2 MWp

Solar Future

DSV PV

2025

34.5 MWp

DSV Rooftop PV